Letter to the editor by Better Transit Alliance member Eric Doherty:
Bus lanes already under construction
Times Colonist, October 27, 2017
Re: “Run electric buses on E&N corridor: firm,” Oct. 24. Why is so much time being wasted talking about bus lanes on the E&N corridor when bus lanes on the Douglas Street/Trans-Canada Highway corridor are already under construction? Continue reading “Another Letter to Editor!”